Skip to content
EX-07 — Entrance doors
← Back to PVC Windows & Doors

SOFTLINE 82

High-performance entrance door

Ud (MD)
1.2W/m²K
Outer wall thickness
3.5mm
Max. glazing / infill
54mm
SOFTLINE 82
PVC Windows & Doors — SOFTLINE 82
01 — Overview

Overview

SOFTLINE 82 is VEKA's high-performance system for PVC entrance doors with an 82 mm build depth. A thermally optimised sash geometry and a thermally broken, barrier-free threshold meet the highest standards of living comfort and thermal insulation.

Increased 3.5 mm outer walls give exceptional stability and durability — important, as no other building element faces as much wind, weather and frequent use as the front door. A dedicated sash profile makes doors with leaf-covering infill panels easy to build.

02

Who it is for

Fewer parts, faster door production

  • 01Reduced parts variety brings many advantages in processing.
  • 02Thermally optimised sash geometry and thermally broken barrier-free threshold.
  • 03Dedicated sash profile for doors with leaf-covering infill panels.
  • 04Class A walls to DIN EN 12608-1.
03

Performance

  1. 01

    Barrier-free threshold

    Flat, integrated, drained threshold to DIN 18025.

  2. 02

    Thermally separated threshold

    Prevents energy loss and cold-air drafts.

  3. 03

    Leaf-covering panels

    Dedicated sash profile for concealed-sash door panels.

04

Specifications

Technical data

EX-07.01
Build depth
82 mm
Min. face width
Fixed: 137 mm; frame + sash: 175 mm
Max. glazing thickness
54 mm
Max. sash width / height
1150 / 2400 mm*
Ud
AD up to 1.3 W/m²K; MD up to 1.2 W/m²K
Sound insulation Rw
Up to 44 dB
Wind-load resistance
Up to class B2
Driving-rain tightness
Up to class 3A
Air permeability
Up to class 3
Burglar resistance
Up to RC2
Wall thickness
Class A to DIN EN 12608-1
  • SOFTLINE 82 — view 101 / 04
  • SOFTLINE 82 — view 202 / 04
  • SOFTLINE 82 — view 303 / 04
  • SOFTLINE 82 — view 404 / 04
Sheet 09 — Enquiry

Specify SOFTLINE 82.

Request catalogues, technical data sheets, samples or a quotation. Tell us about the project and the quantities involved.